Bantwal: District incharge minister B Ramanatha Rai inspected the ongoing work of road construction under ‘Namma Grama Namma Rasthe’ plan at Kanyana village from Angiri to Bairikatte here on September 15.

The cost of the road construction is estimated as 137.70 crore.
Engineer Jayananda Poojary, assistant engineer Shrikanth, Mangalore Assistant Commissioner Dr D R Ashok, Tahshildar Malleswamy, tender S Premnath Bantwal, District panchayath member M S Mohammad and Panemangalore block president Abbas Ali were also present.